Download a schedule of RFP release dates for the Museum’s Bond Projects. As RFP’s are released, specific project information will be made available for download.
Better Denver FAQs (PDF | 119KB)
EDUCATION & COLLECTIONS FACILITY Architectural and Engineering Professional Services #DMNS-ECF/ae
Final A/E Team Ranking: Following is the ranking for the A/E team for the Museum’s ECF project, pending contract negotiations and DSBO review. Once DSBO makes their final determination re: M/WBE goal participation, the Museum will begin contract negotiations with the first ranked team. If an agreement cannot be reached in a short period of time, the number one ranked team will be released and negotiations will begin with the number two ranked team, and so forth.
1. Klipp Architects 2. Bennett Wagner & Grody 3. Fentress Architects 4. OZ/Hartman-Cox Architects |